JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

SA Tenders and Contracts

Department for Infrastructure and Transport 
Find contracts that match specified criteria.

Search Results 

Reference # Contract Title Start Date Expiry Date Total Cost
DIT048941 21C175 - Refurbishment Work at DCP Sturt Assessment Unit - 318 Diagonal Road, Sturt 19/04/2021 06/08/2021 $ 713,841.07
DIT048970 20C156 Redevelopment of Hard Play at Memorial Oval Primary School 16/04/2021 30/06/2021 $ 564,274.70
DIT048615 21C026 Legal Services Fit Out of New Office, Whyalla SA 16/04/2021 30/06/2021 $ 516,993.00
DIT048465 20C890 Construction of the Gorge Road and Silkes Road Junction Upgrade 14/04/2021 13/10/2021 $ 1,387,730.24
DIT048660 20C893 Old Murray Bridge Pier Bearing Packer Replacement 14/04/2021 14/04/2022 $ 611,342.37
20C984 20C984 Construction of Twenty Kilometres of the Main Access Road Upgrade between Fregon East 50 and Number Tank (Stage 2 - Package B) in the APY Lands 12/04/2021 20/03/2022 $ 6,264,698.11
DIT048560 20C410 Construction of the Main North Road and Nottage Terrace Intersection Upgrade 12/04/2021 29/10/2021 $ 4,851,542.30
21C084 21C084 Asphalt Resurfacing on Port Wakefield Road between Two Wells and Port Wakefield (PSABW) 08/04/2021 31/12/2021 $ 9,941,601.49
21C087 21C087 Bituminous Resurfacing of the Riddoch Highway, (Keith to Mount Gambier MM16 - MM30.5) - (PSABW) 07/04/2021 30/11/2021 $ 14,426,600.45
20C1047 20C1047 Asphalt Pavement Rehabilitation and Shoulder Sealing Works on Horrocks Highway (Anama Lane - Clare) - (PSABW) 07/04/2021 31/05/2021 $ 8,160,385.87
DIT048558 20C400 Construction of the Grand Junction Road, Hampstead Road and Briens Road Intersection Upgrade 06/04/2021 01/12/2021 $ 10,811,220.20
DIT048559 20C811 Construction of the Portrush Road and Magill Road Intersection Upgrade 06/04/2021 31/12/2021 $ 11,126,826.16
DIT048793 21C057 - Blackwood High School - Construction of New Canteen and Conference Room 06/04/2021 $ 1,483,278.50
20C1082 20C1082 Pavement Rehabilitation and Sealing of Various Sites on the Stuart Highway (North of Pimba) - (PSABW) 06/04/2021 17/12/2021 $ 23,624,374.18
DIT048396 7148-PC-2019 Settlers Farm Campus R-7 Redevelopment (LPSC - Architecture) 26/03/2021 $ 506,605.00
Pages: 1 2 3 4 5 6 7 ... 22 Records: 1 - 15 of 330